Road Construction Notice - July 22-28, 2024
Current Work
Brook Street - Landscaping
McAlpine Drive - Landscaping
Meenan’s Cove Road (Cobblestone Drive to Rockefeller Drive) - Excavation and storm work (ditching and culverts).
Rynlon Crescent - Landscaping
Tulip Court - Landscaping
Princeton Avenue - Storm sewer installation, including placement of piping and structures
Kingsley Avenue - Replacement of existing driveway culverts will begin
Model Farm Road - Preliminary work on driveway culvert installation
Old Neck Road - Excavation and placement of rock in existing ditch
Detours
While it is anticipated the duration of construction on each street will be limited, motorists are advised to expect traffic delays during the construction period. The Town will make every effort to maintain one lane open at all times or ensure flag persons will be on site to direct traffic through the construction area.
Meenan's Cove Road will have temporary traffic lights setup for one way traffic.
Notes
The 2024 Street Upgrades program is expected to operate through the end of September. The work is being performed by Galbraith Construction Ltd. A full list of streets identified for upgrades is available here.
The work performed, timelines and streets affected are all subject to change. The public will be notified of any major changes.
Residents can now subscribe to have Road Construction Notices delivered directly to their email inboxes. It takes only a couple of minutes to subscribe with a valid email address.
(Image: Intersection of Princeton Avenue and Winchester Drive)
Contact
Engineering
Phone: (506) 849-5749
Email Us